Yes, more resolutions. Lists are meant to keep me honest! ;)
PROJECT: Once-more-from-the-middle Shawl
MATERIALS:
EQUIPMENT:
TO DO: finish the bloody thing
DUE DATE: 31/01/06
PROJECT: 2 wire bracelets for the twins
MATERIALS:
EQUIPMENT:
TO DO: buy wire, beads & clasps, string beads, knit
DUE DATE: 10/02/06
PROJECT: My cabled tunic
MATERIALS:
EQUIPMENT:
TO DO: unravel front, check back, bands, sew up
DUE DATE: 28/02/06
PROJECT: Jumper for Lochie
MATERIALS:
EQUIPMENT:
TO DO: knit from stash yarn
DUE DATE: 28/02/06
PROJECT: Rug for mum
MATERIALS:
EQUIPMENT:
TO DO: source wool (I really want a very soft pink mohair like
Kidsilk Haze in "Grace" but not at $26 a ball), knit
DUE DATE: 26/04/06
PROJECT: JEC's cabled tunic
MATERIALS:
EQUIPMENT:
TO DO: finish back, finish front, bands, sew up
DUE DATE: 31/04/06
PROJECT:
AngelinaMATERIALS:
EQUIPMENT:
TO DO: Wind scanes into balls; knit
DUE DATE: ASAP
PROJECT: Socks for Mum and Scott and MEEEE!
MATERIALS:
EQUIPMENT:
TO DO: well, you know, knit them...
DUE DATE: ongoing
PROJECT: Baby stash
TO DO: keep knitting
DUE DATE: ongoing
PROJECT:
Folly for me
MATERIALS:
EQUIPMENT:
TO DO: knit
DUE DATE: 30/05/06
PROJECT: Reclaim knitted bargains
TO DO: unravel; skein; wash; dry; weigh; ball; devise fiendishly creative ways of using the wool
WHICH ONES: all
DUE DATE: ongoing
PROJECT: Make a swift
TO DO:
Talk to David(20 Dec '05)
DUE DATE: ASAP but in reality "David Time" which is an idiosyncratic measurement.
PROJECT: Red Jumper for Kelly the Kelpie
MATERIALS: 5 x 50g balls Cosy Wool by Lincraft (8ply) in cherry red
EQUIPMENT: 3.25mm and 4mm bamboo needles; 3.25mm dpns; 3.25mm round needle.
TO DO:
Get Kelly's measurements(23 Dec '05 she has a 25" chest and 28" length); knit (started 24 Dec '05)
DUE DATE: Before winter
PROJECT: Find the bloody wool winder
DUE DATE: 25/12/05
PROJECT: Make a
niddy-noddyDUE DATE: 01/01/06
PROJECT: Retrieve Mum's stash
DUE DATE: 01/01/06
PROJECT: Organise my stash
DUE DATE: 02/01/06
DONEPROJECT: London baby Jumper & Hat
TO DO: finish front; finish back (05 Dec '05); sleeves (08 Dec '05); sew up (18 Dec '05); hat (11 Dec '05)
DUE DATE: 25/12/05
PROJECT: Feathers (yuk) scarf for RCTO DO: Not throw up while knitting it
DUE DATE: soon(24 Dec '05)
PROJECT: Rosie's punishment jumper
MATERIALS: 1 x 50g ball pouffy novelty yarn in raspberry; an amount of rasperry angora 8 ply; some cream chenille stuff I got a large cone of at Reverse Garbage years ago.
EQUIPMENT: 3.25mm bamboo needles; 4mm bamboo needles; 3.25mm Aero circular needle; 3.25mm Aero steel DPNS.
TO DO: body band (15 Dec '05); leg bands (25 Dec '05)
DUE DATE: 27/12/05